Trusted Drainage Services

Sewage Treatment Plant Installation

REQUEST A QUOTE TODAY WITH AUTUMN10 FOR 10% OFF

SUBMIT YOUR DETAILS FOR AN INSTANT RESPONSE

Sewage Treatment Plants for Off-Mains Homes & Sites

We design, supply and install modern sewage treatment plants for homes, conversions and small commercial sites that can’t connect to mains sewers. From initial design to final commissioning, we handle the full installation.

  • Complete design, groundworks, plant supply & commissioning
  • Installed to current Building Regulations and environmental rules
  • Ideal upgrade from non-compliant septic tanks or cesspits
  • Fixed-price quotations with clear, itemised scope of works
Ask About Sewage Treatment Plants Free advice & site visit quotations available

Typical Sewage Treatment Plant Package:

  • Site survey and flow/occupancy assessment
  • System sizing and design recommendations
  • Plant supply, delivery & installation
  • Inlet/outlet connections and chambers
  • Power, control cabling & ventilation
  • Start-up, commissioning & handover guidance
Off-Mains Specialists Regulation Compliant Fixed Price Quotes

Why Properties Choose Our Sewage Treatment Plants

A sewage treatment plant is a long-term piece of infrastructure. We focus on correct design, quality equipment and professional installation so your system runs quietly, efficiently and stays compliant for years.

Correctly Sized Design

We size the plant around occupancy, flows and site layout so it performs properly under day-to-day use.

Compliance Focused

Our installations are carried out with Building Regulations, General Binding Rules and discharge consents in mind.

Proven Equipment

We work with established plant manufacturers for reliable performance and easy access to parts and servicing.

Cleaner Effluent

Treatment plants significantly improve effluent quality, protecting streams, ditches and groundwater from pollution.

Clear, Fixed Quotes

We provide itemised quotations up front, so you know exactly what is included in your sewage treatment plant install.

Service & Aftercare

We provide guidance on servicing, desludging intervals and can support with future callouts or upgrades.

Our Sewage Treatment Plant Process

1

Site Survey & Assessment

We visit your property, review existing drainage, check levels and access, and discuss how you use the building.

2

System Design & Sizing

We calculate flows and occupancy, select the right plant size and plan inlet, outlet and venting requirements.

3

Groundworks & Plant Installation

Our team carries out excavation, base preparation, plant positioning and main pipework connections with care.

4

Power, Controls & Outfall

We connect blowers, electrics and control panels, plus drainage fields, ditches or other outfalls as per design.

5

Backfilling, Testing & Commissioning

We carefully backfill in layers, check levels and flows, then test and commission the plant so it runs correctly.

6

Handover & Maintenance Guidance

You receive clear instructions, servicing intervals and any documentation needed for your records and compliance.

Common Sewage Plant Problems We Prevent

Many callouts we attend are down to wrong sizing, poor installation or lack of access for servicing. Getting the system designed and installed properly from the start avoids these headaches.

Frequent Alarms & Callouts

Incorrectly sized or badly set up plants can alarm regularly. We design for realistic flows and ensure correct commissioning.

Odours & Visual Impact

Poor siting or venting can cause smells or unsightly covers. We consider wind, access and landscaping in our designs.

Non-Compliant Discharge

If a plant isn’t installed or run correctly, discharges can fail tests. Our installs follow best practice and manufacturer guidance.

Short System Lifespan

Cheap or poorly installed units often fail early. We specify proven equipment and proper installation methods to maximise life.

Need a New Sewage Treatment Plant Installed?

We install and upgrade sewage treatment plants for homes, barn conversions and small commercial sites across the local area.

  • Ideal replacement for non-compliant septic tanks or cesspits
  • Designed to protect local watercourses and the environment
  • Clear guidance on running costs, servicing and emptying

Book a sewage treatment plant survey

Send us your postcode and a few details and we’ll arrange a convenient site visit.

View Sewage Plant FAQs

Sewage Treatment Plant FAQs

If you are off mains drainage and need a compliant, cleaner discharge than a traditional septic tank, a sewage treatment plant is often the best option. We can confirm this during a free site assessment.
You may need to comply with General Binding Rules or obtain a discharge consent, and Building Control will usually need to be notified. We advise you on what applies and can help with the paperwork.
Most domestic sewage treatment plant installations take around 3–5 working days on site, depending on access, ground conditions and the outfall or drainage field requirements.
Most plants require at least annual servicing and periodic desludging. At handover we explain the recommended intervals for your specific unit so you can budget ahead.
Yes. We regularly upgrade older septic tanks and cesspits to modern sewage treatment plants, reusing sound pipework where suitable and bringing the system up to current standards.

REQUEST A QUOTE TODAY WITH AUTUMN10 FOR 10% OFF

SUBMIT YOUR DETAILS FOR AN INSTANT RESPONSE

1